![]() Building Permit for New Construction and Additions to "Other Than a Single-Family Home:".An additional fee for the state of four dollars and 50 cents ($4.50) shall be added to all permits. All fees are noted on the application.The total shall then by multiplied by eight dollars ($8.00) and add the four dollar and 50 cent ($4.50) state fee. The fee for a Building Permit for a single family home shall be calculated as per the square footage outlined on the Building Permit Application.See Permit Application for Cost Details.Building Permit for Single-Family Home:.It would behoove the applicant to bring a blank check to allow staff to review the application to ensure proper calculations have been done. When submitting an application, all fees are due at time of submission. The schedule of fees is available for review. These fees shall apply to all applications for building permits for which an application for a permit has been made on or after January 1, 2022. The following fees shall be charged by Lower Paxton Township for the submission of an application, review of plans, issuance of permits, inspection of work, and issuance of certificates of occupancy for construction of, additions to, or repair of any building or structure.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |